| Military |
12/29/25 1756Z | 1/1/26 1756Z | | M0279/25 NOTAMC M0264/25 |
12/29/25 1755Z | 2/5/26 0500Z | | HLP 4 AND 5 CLOSED DUE TO RWY 24L CONSTRUCTION AND VEHICLE HAUL ROUTES. |
12/29/25 1752Z | 1/1/26 1752Z | | M0277/25 NOTAMC M0266/25 |
12/29/25 1751Z | 2/5/26 0500Z | Runway | RWY 24L/6R CLOSED FIRST 1,500 FT FOR CONCRETE DEMO. LAST 6,500 FT OF RWY USED FOR CONSTRUCTION VEHICLES AND HAUL ROUTES. |
12/22/25 2045Z | 1/9/26 1530Z | | ASR Z RWY 06L: CAT AB 820-1 388 (400-1), CDE 820-1 1/8 388 (400-1 1/8 |
12/22/25 2042Z | 1/9/26 1530Z | | ASR RWY 24R: CAT AB 960-1/2 485 (500-1/2), CDE 960-1 485 (500-1). STE |
12/22/25 2031Z | 1/9/26 1530Z | | ALL RADAR PROCEDURES: CIRCLING ALL RWY CAT AB 1140-1 663 (700-1), CAT |
12/22/25 2030Z | 1/9/26 1530Z | | ASR Y RWY 06L: CAT AB 1140-1 708 (700-1), CDE 1140-2 708 (700-2) |
12/22/25 2026Z | 1/5/26 0500Z | | EXCEPTION TO AIRFIELD HOURS FOR JANUARY: 01-04 JAN (THURS-SUN) CLOSED; AND MON, 5 JAN 1530-0500Z. AIRFIELD HOURS ARE SUBJECT TO CHANGE UPON FLIGHT OPS COMPLETION AND ARE OPEN TO BOTH TENANT AND TRANSIENT PPR APPROVED AIRCRAFT |
12/22/25 2022Z | 1/9/26 1530Z | | PAR RWY 24R (FPN - 68) : GLIDEPATH 3.2 DEGREES, TCH 57, RPI 1130. CAT ABCDE 897- 3/4 422 (500 - 3/4). WHEN ALS INOP, INCREASE VIS TO 1 1/4 MILES. |
12/22/25 2021Z | 1/9/26 1530Z | | PAR W/O GS RWY 24R (FPN - 68) : CAT AB 1000 - 1/2 525 (600-1). WHEN ALS INOP, INCREASE CAT AB VIS TO 1 MILE, CAT CDE VIS TO 1 1/2 MILES. STEPDOWN FIX AT 3 NM FROM RPI, 1500 MIN; STEPDOWN FIX AT 2 NM FROM RPI, 1160 MIN. |
12/22/25 2019Z | 1/9/26 1530Z | Runway | RWY 24R/6L SINGLE RWY OPS IN EFFECT. APPROACH END ARRESTING GEAR DE-RIGGED WITH A 3-5 MIN RESPONSE TIME. DEPARTURE END ARRESTING GEAR FULLY RIGGED. PLEASE PLAN AHEAD FOR FUEL IN CASE OF ANY AIRCRAFT EMERGENCIES OR DIVERTS. |
12/22/25 2018Z | 1/9/26 1530Z | | STOVL OPS AUTH RWY 24R WITHIN THE FIRST 1,500 FT. RADAR CAMERA DEGRADED. FOD REPORTS REQUESTED TO ODO. LSO VEHICLE AND RADIO CHECKOUT AVAIL AT BASE OPS. |
12/22/25 2018Z | 1/9/26 1530Z | | PAR UNAVBL PERIODICALLY DUE TO MAINTENANCE. CHECK ATIS OR TOWER FOR SERVICEABILITY |
12/22/25 2017Z | 1/9/26 1530Z | | AIRFIELD BEACON OTS FOR MAINTENANCE. |
12/22/25 2016Z | 1/9/26 1530Z | | VLP 2 CLOSED DUE TO RWY 24L CONSTRUCTION AND VEHICLE HAUL ROUTES. |
12/22/25 2009Z | 1/9/26 1530Z | | LIMA TWY CLOSED BETWEEN PAPA AND QUEBEC TWYS FOR ELECTRICAL MAINTENANCE. |
12/9/25 2041Z | 1/9/26 1530Z | | VLP 1 NORTH TAXI ROUTE CLOSED DUE TO RWY 24L CONSTRUCTION. SOUTH TAXI ROUTE OPEN TO ECHO TWY. |
12/9/25 2038Z | 1/9/26 1530Z | | HLP 3 PERIMETER LIGHTING OTS. DEPARTURES AND HOVER CHECKS AUTH FOR DAYTIME USE ONLY. |